Filter StripsPretreatment
Pea gravel diaphragm
- located along top of slope
Uphill area, above shallow ponding limit, provides additional pretreatment
Notes:
A pea gravel diaphragm is recommended along the top of the slope. The uphill area, above the shallow ponding limit provides additional pretreatment.