Infiltration BasinDesign Notes
Failure rates of 25 to 100% recorded in the field
Pretreatment with settling basin is recommended
Partially excavated basins should not be used as sedimentation basins during construction
Final excavation should be deferred until all contributing areas have been stabilized or protected
A 6 to 12 inch layer of filter material (e.g., coarse sand) is recommended to prevent the builup of impervious deposits on the soil surface. This layer can be replaced when it becomes clogged.
Notes:
Specific considerations associated with infiltration basins are listed in this slide.