Infiltration TrenchDesign Notes Cont’d
Maximum trench depth is determined by:
dmax = f Ts/n
Where:
dmax = maximum depth
f = final infiltration rate (in/hr)
Ts = maximum allowable storage time (hr)
n = porosity
Notes:
Maximum trench depth is determined by the above equation.